{"id":346,"date":"2009-01-10T00:01:25","date_gmt":"2009-01-10T04:01:25","guid":{"rendered":"http:\/\/www.glacialcommunications.com\/news\/?p=346"},"modified":"2009-01-10T00:01:52","modified_gmt":"2009-01-10T04:01:52","slug":"things-im-doing-part-n","status":"publish","type":"post","link":"https:\/\/www.glacialcommunications.com\/news\/2009\/01\/things-im-doing-part-n\/","title":{"rendered":"Things I&#8217;m doing, part N"},"content":{"rendered":"<p>Things that have been going on in the last few weeks:<\/p>\n<p>1. The SN-Voice has progressed a little bit &#8211; <a href=\"http:\/\/www.flickr.com\/photos\/glacial23\/sets\/72157612115709503\/\">The front panel is drilled<\/a>, and I think I&#8217;m in possession of all the required parts. Now begins the joyous task of mounting the front panel controls, and then wiring them to the PCB. I technically still need the tempco, but I thought about just mounting header sockets, and using a regular 2k resistor for now &#8211; like drift really bothers me&#8230; I&#8217;ve still got a little time to think this over.<\/p>\n<p>2. Mega Percussive Synthesizer &#8211; All remaining parts (except the polystyrene caps) have been ordered. Need to solder them in&#8230;<\/p>\n<p>3. Recording process &#8211; All of side 2 is edited down. Now to get an appropriate 15 minutes out of side 1, which is currently 23&#8217;40&#8221;. Still need two song titles, and an album title.<\/p>\n<p>4. Signed up for the <a href=\"http:\/\/www.rpmchallenge.com\">RPM Challenge<\/a> again, so hot on the heels of this thing will be another recording, though probably with fewer rules.<\/p>\n<p>5. Got an iPod touch this week. The eventual plan is to maybe develop for it. We&#8217;ll see how that goes&#8230;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Things that have been going on in the last few weeks: 1. The SN-Voice has progressed a little bit &#8211; The front panel is drilled, and I think I&#8217;m in possession of all the required parts. Now begins the joyous task of mounting the front panel controls, and then wiring&#8230; <a class=\"continue-reading-link\" href=\"https:\/\/www.glacialcommunications.com\/news\/2009\/01\/things-im-doing-part-n\/\"> Continue reading <span class=\"meta-nav\">&rarr; <\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,1,20,16],"tags":[],"class_list":["post-346","post","type-post","status-publish","format-standard","hentry","category-future-projects","category-general","category-software","category-synthesizers"],"_links":{"self":[{"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/posts\/346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/comments?post=346"}],"version-history":[{"count":4,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/posts\/346\/revisions"}],"predecessor-version":[{"id":350,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/posts\/346\/revisions\/350"}],"wp:attachment":[{"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/media?parent=346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/categories?post=346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.glacialcommunications.com\/news\/wp-json\/wp\/v2\/tags?post=346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}